EIP Radar
@ 41a838d ·
EIP-3238

Difficulty Bomb Delay to Q2/2022

StagnantLegacy PoW

Status history

  1. Draft25 Jan 2021
  2. Stagnantdate not observed

Abstract

Starting with FORK_BLOCK_NUMBER the client will calculate the difficulty based on a fake block number suggesting to the client that the difficulty bomb is adjusting eleven million blocks later than the actual block number.

Created
25 Jan 2021
Authors
Afri Schoedon
Upgrades
Not listed in any upgrade
Requires
—
Required by
—